MANILA, Philippines — Repairs on the Chinese Coast Guard (CCG) ship that collided with another Chinese ship in Bajo de Masinloc (Panatag Shoal) early this August may take up to two months, a Philippine Navy official said on Thursday.
In an online interview, Rear Admiral Roy Vincent Trinidad, Philippine Navy spokesman for the West Philippine Sea (WPS), gave the estimate after Reuters reported that the ship was currently being repaired at a naval base in China’s Hainan Island.
“Generally, I would say, around one to two months,” he said.
On August 11, the CCG ship with bow number 3104 collided with a People’s Liberation Army (PLA) Navy warship as they were chasing the Philippines’ BRP Suluan on a mission to give aid to fisherfolks in Bajo de Masinloc.

The damage sustained by the CCG ship made it “unseaworthy,” according to Philippine Coast Guard (PCG) spokesman for the WPS Jay Tarriela.
Repairs on Chinese ship in Bajo de Masinloc collision may take 2 months - PH Navy
Trinidad however noted that repairs would be longer if more crucial parts of the ship were damaged.
“What is important here is the alignment of the shafting, so if there will be damages or misalignment to that, that would entail more repair work,” Trinidad said.
Videos showed four CCG personnel disappear from the impact of the collision., This news data comes from:http://xs888999.com
Although the Chinese government has yet to confirm any casualties, Armed Forces of the Philippines Chief Romeo Brawner said they received reports that two had died and two were still left missing.
- Philippines to launch shame campaign vs traffic violators
- Lacson warns lawmakers may be complicit in ghost flood control projects
- BIR to audit contractors flagged for ghost flood projects for tax fraud — BIR
- North Korean leader inspects new missile factory ahead of visit to China
- Thousands protest in Indonesia as military deployed in capital
- France seized by fears of new political crisis
- Public Works chief to press criminal charges against Bulacan engineer
- LPA east of Surigao del Sur may intensify into tropical depression
- DSWD allocates P6.2B for livelihood program
- Nartatez vows to be fair in making reassignments